Skip to main content
EWPAustralia
Wagga Wagga, NSWMajor Inspections

Major EWP Inspections in Wagga Wagga

Years of Riverina work leave marks a visual check can't confirm — the heat-cycling of long, hot summers, dusty freight-yard and rural environments, and constant use on machines that rarely get an easy day. Depending on the equipment class, the major inspection falls due at five or ten years, and it exists to open up the structure so fatigue and hidden corrosion in box sections, pins and weld zones can be found before they become a failure.

EWP Australia runs major inspections for Wagga Wagga owners — full structural strip-down, NDT of welds, pins and bosses, hydraulic and electrical overhaul assessment, load testing on completion and the engineering documentation that resets the machine's inspection baseline. The scope and quote are agreed before disassembly, so the work stays defined and never turns into an open-ended rebuild.

Call 0416 689 689
What's Included

10-Year Major Inspections — The Scope

  • Full strip-down and inspection of structural and load-bearing components
  • NDT (crack testing) of welds, pins, bosses and critical sections
  • Hydraulic, electrical and safety-system overhaul assessment
  • Load testing on completion, witnessed and documented
  • Engineering documentation recording the machine's new inspection baseline
  • A clear scope and quote before work starts — no open-ended rebuilds
Learn More

Full Service Detail

These pages describe how 10-year major inspections works for Wagga Wagga operators. For the full service description — process, standards and FAQs — see:

FAQs

10-Year Major Inspections in Wagga Wagga — Common Questions

How is the major date worked out — is it the same for every machine?

No, it's set per machine. Some platform types reach their major at five years and others at ten, according to the equipment class and the manufacturer's schedule. Provide the make, model and serial and the right due point is confirmed first.

Can we time the strip-down for when our operation slows down?

Yes. Locking in the booking ahead of the due date means you choose the quieter stretch for the machine to be off the road, so it's stripped, re-baselined and returned before the next busy run. Share your seasonal rhythm when you enquire.

EWP Owners & Fleet Operators

Own an EWP?

Major inspections, compliance certification, repairs and fleet maintenance — handled end-to-end by EWP specialists.

Technicians & Service Businesses

Work on EWPs?

Join our growing national network of EWP technicians, mechanics, hydraulic specialists, engineers and mobile service providers.

Call Now