Fleet Inspection Due-Date Planner
When you run a fleet of elevated work platforms, the hard part isn't working out when one machine is due — it's seeing the whole fleet at once so nothing slips through. This free planner takes each unit's last annual and last major inspection dates, adds the correct intervals, and lays the results out as a rolling month-by-month view of the year ahead. You can see at a glance which machines fall due in which month, and which ones are already overdue, so you can book inspections in sensible batches instead of scrambling one unit at a time.
Our single-machine Major Inspection Due Date Calculator answers the question for one asset; this tool is the whole-fleet companion, built for the person juggling a yard of booms, scissors and truck-mounted units. Annual inspections are added twelve months from the last one. Major inspections are trickier: the major cycle falls due at five years OR ten years depending on the equipment class, so you choose the cycle for each unit yourself rather than us assuming one. Everything is computed purely from the dates you type in — no rates, no invented intervals — and it runs entirely in your browser. When you can see what's coming, call 0416 689 689 and we'll coordinate the inspections.
Add A Fleet Unit
The major cycle is five years OR ten years depending on the equipment class — set it per unit from the machine's own documentation. Leave a date blank if you only want to plan the other inspection for that unit.
Your 12-month view builds here
Add your first machine above with its last annual and last major inspection dates. As you build the fleet up, a month-by-month calendar of what's due assembles here, with overdue units flagged at the top.
How This Works & Assumptions
How it works
Add each machine in turn with its plant ID or name, the date of its last annual inspection and the date of its last major inspection, and pick whether that unit runs on a five-year or ten-year major cycle. For every unit the planner adds twelve months to the last annual date, and adds your chosen cycle to the last major date, then drops each result into a month-by-month view of the year ahead. Anything already past its date is pulled out into a separate overdue list so it doesn't get lost in the calendar.
Why you choose the major cycle. Major inspections fall due at five years OR ten years depending on the equipment class — there is no single figure that fits every machine, so we don't assume one for you. You select the cycle per unit from the machine's own documentation and equipment class. If you're unsure which applies, that's exactly the kind of thing to confirm before you plan the downtime.
Single machine vs. whole fleet. If you only need one machine's next major, the Major Inspection Due Date Calculator answers that in a couple of clicks. This planner is the fleet-wide companion — it stacks every unit's annual and major dates into one forward view so you can batch and budget the year's inspections together.
Assumptions and limits. Everything is computed purely from the dates you type in — nothing is pre-filled and no intervals are invented. Dates are added on a calendar basis and clamped to the last day of shorter months. The output is an unreviewed working draft you must complete, check against each machine's paperwork and equipment class, and sign off yourself; it is not a compliance record or an approved schedule. As an independent EWP inspection, service and sales specialist we can help you confirm what's due and coordinate the work.
This is a planning aid, not a compliance ruling. Each machine's records, its data plate and its equipment class govern. Nothing leaves your browser. When you know what's coming, call 0416 689 689 and we'll help schedule it.