5-Year Major EWP Inspections in Brisbane
Brisbane's construction growth ahead of 2032 means there's a cohort of machines purchased at the start of that build-out that are now arriving at their mid-life inspection milestone. For a Brisbane fleet, the 5-year major — where the equipment class requires it rather than a 10-year interval — is the point at which a machine is either confirmed as structurally sound for its next service life or identified as needing significant remedial work before it can continue in service.
EWP Australia carries out 5-year major inspections for Brisbane operators — confirming first whether the equipment class calls for a 5 or 10-year major, then delivering the teardown assessment of structural and load-bearing components, NDT, and documentation. Brisbane's climate means the inspection pays particular attention to corrosion and humidity-related degradation in structural and electrical systems.
5-Year Major Inspections — The Scope
- Class confirmation — we verify whether a 5 or 10-year major applies to each machine
- Teardown-level assessment of structural and load-bearing components
- NDT (crack testing) of welds, pins, slew rings and structural connections
- Hydraulic and electrical overhaul assessment at the disassembly level
- Functional and load testing on completion
- Engineering documentation establishing the machine's new inspection baseline
Full Service Detail
These pages describe how 5-year major inspections works for Brisbane operators. For the full service description — process, standards and FAQs — see:
5-Year Major Inspections in Brisbane — Common Questions
How does Brisbane's climate affect what the 5-year major inspection looks for?
The teardown examination is the same regardless of location, but the inspection pays particular attention to corrosion in structural sections, fasteners and electrical systems — the areas Queensland humidity affects most between annual checks.
Should Brisbane machines be inspected for the 5-year major before or after a wet season?
After a wet season is a sound time to carry out the teardown — the season's effects are visible in the assessment. The important thing is not deferring past the class milestone.
Other Inspection Services in Brisbane
5-Year Major Inspections Across Australia
- Sydney
- Melbourne
- Perth
- Adelaide
- Canberra
- Hobart
- Darwin
- Newcastle
- Gold Coast
- Geelong
- Townsville
- Wollongong
- Sunshine Coast
- Cairns
- Mackay
- Bunbury
- Ballarat
- Orange
- Dubbo
- Wagga Wagga
- Tamworth
- Albury
- Port Macquarie
- Coffs Harbour
- Toowoomba
- Rockhampton
- Gladstone
- Bundaberg
- Hervey Bay
- Alice Springs
- Bendigo
- Mildura
- Shepparton
- Geraldton
- Albany
- Kalgoorlie
- Devonport
- Launceston
- All service areas