Skip to main content
EWPAustralia
Hervey Bay, QLDMajor Inspections

5-Year Major EWP Inspections in Hervey Bay

Hervey Bay's growing coastal economy has a fleet that's mostly small-to-medium in scale, which means the mid-life major inspection milestone often arrives for owner-operators who haven't encountered it before. Whether the machine needs a 5 or 10-year major inspection depends on the equipment class — and understanding which it is, and what the teardown assessment involves, is the starting point for planning around the downtime it requires.

EWP Australia delivers 5-year major inspections across Hervey Bay and the Fraser Coast, starting with a clear explanation of which milestone applies to each machine's class and what the inspection involves. Teardown assessment of structural and load-bearing components, NDT of critical sections, and documentation that establishes a new inspection baseline are delivered in a format the machine's owner can understand and use for compliance purposes.

Call 0416 689 689
What's Included

5-Year Major Inspections — The Scope

  • Class confirmation — we verify whether a 5 or 10-year major applies to each machine
  • Teardown-level assessment of structural and load-bearing components
  • NDT (crack testing) of welds, pins, slew rings and structural connections
  • Hydraulic and electrical overhaul assessment at the disassembly level
  • Functional and load testing on completion
  • Engineering documentation establishing the machine's new inspection baseline
Learn More

Full Service Detail

These pages describe how 5-year major inspections works for Hervey Bay operators. For the full service description — process, standards and FAQs — see:

FAQs

5-Year Major Inspections in Hervey Bay — Common Questions

What does a 5-year major inspection actually involve for a Hervey Bay machine?

The machine is stripped to the level the standard requires, structural and safety-critical components are assessed, NDT is carried out on welds and pins, and the machine is reassembled and tested. We explain what we find and what it means before any repair work is quoted.

Does a Hervey Bay trade operator need a 5-year major inspection or is that just for commercial fleets?

The major inspection obligation applies based on equipment class, not fleet size. A sole trader with one machine has the same obligation as a fleet operator — we help plan around the downtime for operators of any scale.

EWP Owners & Fleet Operators

Own an EWP?

Major inspections, compliance certification, repairs and fleet maintenance — handled end-to-end by EWP specialists.

Technicians & Service Businesses

Work on EWPs?

Join our growing national network of EWP technicians, mechanics, hydraulic specialists, engineers and mobile service providers.

Call Now